Problem (Issue) Statement: | How to troubleshoot the issue where the double leaf door configuration is not released or only 1 door is released |
Description: | This article will guide users on how to troubleshoot the issue where the double leaf door configuration is not released or only 1 door is released. |
Related Software: | NIL |
Related Hardware: | - XP-M1000X
- XP-M1000ABX
- XP-M1300X
- XP-M1300ABX
- XP-M1000XE
- XP-M1000CPX
|
System Application: | NIL |
Symptom and Finding: | - Symptom 1: Only 1 door is opened after "Valid Entry Access" or after users pressed the push button
- Symptom 2: Both doors not opened after "Valid Entry Access" or after users pressed the push button
|
Cause: | - For Symptom 1: Only one EM Lock is connected to the MAS-RBU
- For Symptom 2:
a. Incorrect wiring connection from MAS-RBU to EM Lock b. Incorrect wiring connection from MAS-RBU to push button c. Reader / MAS-RBU is not producing power
|
| . Step-by-step Guide:
Troubleshooting Symptom 1 where only 1 door is opened:
Step 1: Please check and ensure that the wiring connection to the MAS-RBU is correct as per the following wiring diagram:
![Wiring Diagram for the Double Leaf Door Configuration using MAS-RBU Wiring Diagram for the Double Leaf Door Configuration using MAS-RBU](https://microengine.atlassian.net/wiki/download/thumbnails/990839007/em-lock-to-relay-board-wiring-connection-diagram.png?version=1&modificationDate=1570700178433&cacheVersion=1&api=v2&width=569&height=463) Figure 1: Wiring Diagram for the Double Leaf Door Configuration using MAS-RBU . . Troubleshooting Symptom 2 where both doors not opened:
Step 1: Please check and ensure that the wiring connection to the MAS-RBU is correct as per the following wiring diagram:
![Wiring Diagram for the Double Leaf Door Configuration using MAS-RBU Wiring Diagram for the Double Leaf Door Configuration using MAS-RBU](https://microengine.atlassian.net/wiki/download/thumbnails/990839007/em-lock-to-relay-board-wiring-connection-diagram.png?version=1&modificationDate=1570700178433&cacheVersion=1&api=v2&width=569&height=463) Figure 2: Wiring Diagram for the Double Leaf Door Configuration using MAS-RBU Relay Board . Step 2: Please also check that the wiring between the MAS-RBU and the controller unit is correct as per the wiring diagram below:
![Wiring Diagram from the Controller to the MAS-RBU Relay Board Wiring Diagram from the Controller to the MAS-RBU Relay Board](https://microengine.atlassian.net/wiki/download/thumbnails/990839007/relay-board-to-controller.png?version=1&modificationDate=1570700177567&cacheVersion=1&api=v2&width=747&height=566) Figure 3: Wiring Diagram from the Controller to the MAS-RBU Relay Board . Step 3: Users are also advised to check and confirm the wiring connection from the reader to the controller. |
Common Issues: | |
Porting Date: | 10/10/2019 |