$customHeader
Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Problem (Issue) Statement:How to troubleshoot the issue where the double leaf door configuration is not released or only 1 door is released
Description:

This article will guide users on how to troubleshoot the issue where the double leaf door configuration is not released or only 1 door is released.

Related Software:NIL
Related Hardware:
  • XP-M1000X
  • XP-M1000ABX
  • XP-M1300X
  • XP-M1300ABX
  • XP-M1000XE
  • XP-M1000CPX
System Application:NIL
Symptom and Finding:
  • Symptom 1: Only 1 door is opened after "Valid Entry Access" or after users pressed the push button
  • Symptom 2: Both doors not opened after "Valid Entry Access" or after users pressed the push button
Cause:
  • For Symptom 1: Only one EM Lock is connected to the MAS-RBU
  • For Symptom 2
     a. Incorrect wiring connection from MAS-RBU to EM Lock
     b. Incorrect wiring connection from MAS-RBU to push button
     c. Reader / MAS-RBU is not producing power

Summary:

.

Warning!

  • Users are not recommended to run any xPortal software in Windows XP operating system as the system is unstable

  • Users are also advised to stop the xPortal Services before shutting down the Server PC to prevent any missing transaction issues.

.

.

Step-by-step Guide:
  • Troubleshooting Symptom 1 where only 1 door is opened:

Step 1: Please check and ensure that the wiring connection to the MAS-RBU is correct as per the following wiring diagram:
Wiring Diagram for the Double Leaf Door Configuration using MAS-RBU
Figure 1: Wiring Diagram for the Double Leaf Door Configuration using MAS-RBU

.

.

  • Troubleshooting Symptom 2 where both doors not opened:

Step 1: Please check and ensure that the wiring connection to the MAS-RBU is correct as per the following wiring diagram:
Wiring Diagram for the Double Leaf Door Configuration using MAS-RBU
Figure 2: Wiring Diagram for the Double Leaf Door Configuration using MAS-RBU Relay Board

.

Step 2: Please also check that the wiring between the MAS-RBU and the controller unit is correct as per the wiring diagram below:
Wiring Diagram from the Controller to the MAS-RBU Relay Board
Figure 3: Wiring Diagram from the Controller to the MAS-RBU Relay Board

.

Step 3: Users are also advised to check and confirm the wiring connection from the reader to the controller.

Common Issues:

NIL

Porting Date:10/10/2019

PROOF-READ

.

Related Articles.

Containing the label "xp-m1000x"

Filter by label

There are no items with the selected labels at this time.

  • No labels