Problem (Issue) Statement: | How to configure Instruction Control for alarm monitoring system application at xPortalNet Client? |
Document No: | ID-000059 |
Categories: | Knowledge Base |
Type: | Software configuration |
Technical Level: | 1 |
Related Project Name: | - Harrington, Kota Kinabalu Sabah (SI: MIE)
- DBS, Taman Desa (SI: YL System)
- Uptown Mall (SI: SKA Technologies S/B)
- Women And Child Hospital (SI: EV Dynamic S/B)
|
Site Deployment Date: | 8/3/2017 |
Description: | A guide to configure Instruction Control for alarm monitoring system application at xPortalNet Client. |
Related Software: | |
Related Hardware: | - XP-SNETv2 v3.48
- XP-SNET-E32R
- XP-SNET-E248
|
System Application: | Alarm Monitoring System |
Symptom and Finding: | NA |
Cause: | For first time configuration on Instruction Control for alarm monitoring system application at xPortalNet Client |
Solution: | Step 1: Open xPortalNet Comm Service. Step 2: Ensure that the xPortalNet Comm Service Status is Running. Figure 2: xPortalNet Comm Service Running pop-up message
Step 1: Go to xPortalNet Client > System Setting > Instruction Control. The Instruction Setup window will be shown as below: Figure 1: Instruction Setup Window Step 2: Click Add to create a new instruction. The Add Instruction window will be shown as below. Fill in the respective fields and click OK to save changes. Figure 2: Add Instruction Window
Step 3: Repeat steps 1 and 2 to add additional Instruction Setups as necessary.
Step 4: The following message window will be prompted to show that Record is Added. Click OK to continue.
Figure 3: Record Added Window
Step 1: After completing the configuration settings, users MUST send all settings to the controller. Step 2: Go to Device Comm > Send Door Setting. Figure 4: Send Door Setting Button
Step 3: Select the controller to send all settings. Click Send All Settings to send all configuration settings to the selected controller.
Step 4: The Delivery Report will be prompted. Ensure that software have sent all configuration settings successfully.
Step 1: To check the status of the controller, go to xPortalNet Client > Device List > Controller List to verify that the controller Status is Up. Figure 5: Controller List under Device List tab Step 2:To check the status of the alarm controller, go to xPortalNet Client > Device List > Alarm Controller List to verify that the alarm controller Status is Up. Figure 6: Alarm Controller List under Device List tab
Step 3: To check the status of the output, go to xPortalNet Client > Output List to observe the output status. Figure 7: Output List under Device List tab
Step 4: To check the status of the input, go to xPortalNet Client > Input List to observe the input status. Figure 8: Input List under Device List tab
|
Date Documentation: | 24/5/2018 (Rev 1.0) |